A substantial amount of heavy-lift and major project transport operations have been performed by Unitrans Iran Dena that are not included below.

Assaluyeh MEG Plant

Highlights: Receiving and transporting to storage area of 2 x 950te ethylene oxide reactors with a total haulage weight of 1,200te including support structures and trailers. Temporary storage area consisted of reinforced concrete foundations designed and prepared by Unitrans Iran Dena.
Contractor: Mitsui Engineering and Shipbuilding

Assaluyeh IRCX HOPE Petrochemical Plant

Highlights: Heavy transport of a 220te dryer with 35m length plus two polymerizersand over 30,000 freight tons of general andout-of-gauge cargo.
Contractor: MES/RAMPCO

Assaluyeh South Pars On-Shore Facilities: Phases 6, 7 & 8 Expansion

Highlights: Transportat ion of ove r 50,000 freight tons of general and out-of-gauge cargo.
Contractor: J oin t Venture of TOYO/IORO/ JGC/ DAELIM

Ilam HOPE Petrochemical Plant

Highlights: Heavy transport of a 220te dryer with 35m length plus two polymerizersand over 30,000  freight tons of general and out-of-gauge cargo from Bandar Imam Khomeini to 11am, Iran (over 500km.)
Contractor: MES/EIED

Rud-e Shur 2000MW Gas Power Plant: Phase 1

Highlights: Multiple heavy-lifts over 300 tons per piece; plus, over 30,000 tons of general and out-of-gauge cargo from Bandar Abbas to Robat Karim site (over 2,000km distance.) Unitrans Iran Dena, in conjunction with a professional engineering consultant, designed and fabricated a 360te capacity, strand-jack gantry system that was used to install the

22 Units Combined Cycle Power Plant

Highlights: 69 heavy-lifts ranging from 135 tons up to 255 tons per piece; plus, over 50,000 freight tons of general cargo and out-of-gauge cargo throughout Iran.
Contractor: MAPNA